The total value of these two contracts is estimated to be at least USD 9.5 billion. LGES plans to manufacture these batteries at its plant in Poland, starting in 2026.
» Evertiq
The total value of these two contracts is estimated to be at least USD 9.5 billion. LGES plans to manufacture these batteries at its plant in Poland, starting in 2026.
» Evertiq